Skip to content
Burlington & Halton · phones answered 7 daysCall a plumber: (365) 414-5748
Plumbers in BurlingtonHonest plumbing, set in good order.Call
A light washroom with a sink and faucet on a cabinet
New fixtures sit on supply and drain lines planned at rough-in.
Answered by a plumber
Renovations

Bathroom Renovation Plumbing in Burlington

When the bathroom is stripped to studs we move drains, set the shower valve at the right depth, rough in supply lines, vent properly and test everything before the tile goes up.

  • The cause found and shown to you before work starts
  • Rough-in: Drains, vents, supply, shower valve
  • Inspection: Before walls close where a permit applies
  • Tested by: Drain water test and supply pressure test
  • Licensed & insured (details on request)
  • Price before tools
  • Clean, covered work area
  • Tested before we leave
At a glance
Rough-in
Drains, vents, supply, shower valve
Inspection
Before walls close where a permit applies
Tested by
Drain water test and supply pressure test

When you need bathroom renovation plumbing

Any renovation that goes beyond swapping a vanity top needs a plumber. Shifting the toilet, trading the tub for a curbless or walk-in stall, doubling up vanities, installing a freestanding tub or relocating the bathroom entirely all change drains and vents. Even a like-for-like update is a chance to replace old shut-offs, a corroded tub drain or a shower valve that cannot be serviced.

How the job is done

  1. Plan. We look at the existing stack and floor joists to see where drains can go, then mark fixture centres with you and your contractor.
  2. Permit. Changes to drains, vents or fixture locations need a City of Burlington plumbing permit; we help arrange it.
  3. Rough-in. Drains, vents and supply lines are installed in the open walls and floor, the mixing valve is positioned to suit the finished tile thickness, and everything is pressure-tested.
  4. Inspection. An inspector signs off the open work.
  5. Finish. Once tiling and painting wrap up, fixtures, trims and toilets are set and tested.
Ring (365) 414-5748 for a plumber

Describe the drain, pipe or fixture and get a straight answer on the phone.

Call now

Burlington homes and this work

Bathrooms in 1960s and 1970s homes often hide galvanized supply lines and cast iron drains under the floor. Gutting the room is the cheapest time to swap them out. In 1980s and 1990s homes, Poly-B is common behind bathroom walls. Curbless showers are popular, but they require the floor to be recessed or built up for drainage, which is easier to plan before demolition than during it.

What affects the scope

  • How far fixtures move from their current locations
  • Joist direction under a relocated toilet or shower drain
  • Old pipe materials found when walls open
  • Specialty items: body sprays, steam, heated floors, wall-hung toilets

Before we arrive

Have your fixture list and any spec sheets ready. Tell us your contractor's schedule so rough-in and finishing visits fit around drywall and tile. For lower-level projects see basement bathroom rough-in.

Questions we get on this

Can a toilet be moved anywhere?

Within limits. Its drain needs room to slope to the stack and must not cut through key joists; we check before you commit.

Is a permit needed for a new vanity?

A like-for-like fixture swap usually does not. Moving or adding drains does.

Ring (365) 414-5748 for a plumber

One call to (365) 414-5748 puts you through to a Burlington plumber.

Call now
Call a plumber · (365) 414-5748